home *** CD-ROM | disk | FTP | other *** search
/ ShareWare OnLine 2 / ShareWare OnLine Volume 2 (CMS Software)(1993).iso / win2 / sew100.zip / HELP2.TXT < prev    next >
Text File  |  1993-03-01  |  868b  |  18 lines

  1. To schedule, point the mouse to any schedule location,
  2. press down on the left button (hold it down) and drag 
  3. a line by moving the mouse. Place the pointer in the 
  4. center of the line, press the left button (hold it 
  5. down) and move the line left and right. To stretch an
  6. existing line, point to either end, hold down the left 
  7. button as you move the mouse. If you double click on a 
  8. line, the line will be deleted.
  9. See the manual for duplicating an employee schedule.
  10. Use the option buttons on the bottom of the screen
  11. to display current totals next to the employee's name. 
  12. Use scroll bars to switch between days and hours 
  13. displayed to the screen. You may stretch a line 
  14. representing time worked and push it into the next or 
  15. previous day. If you have more employees than will fit 
  16. on the screen, use the vertical scroll bar to scroll up 
  17. and down.
  18.